Laying of Pouma cut stone – use of local materials in design
Project carried out by the startup Archi_TECH in the city of Yaoundé (Cameroon).Total construction cost: 70,000,000 FCFA. Ground floor: 02 living rooms, dining room, kitchen, guest room, guest toilet. Floor: 02 bedrooms, + toilets + balconies, and master suite. For any useful purpose:...
Waste disposal project of a municipal waste disposal center in the city of Douala 1st. Design and construction: Archi-TechThe project is located opposite the Sandaga market, at the 4th roundabout. This project was built in July 2023
Waste disposal project of a municipal waste disposal center in the city of Douala 1st. Design and construction: Archi-TechThe project is located opposite the Sandaga market, at the 4th roundabout. This project was built in July 2023
Déchèterie municipale de Douala 1er à Douala Déchèterie municipale de Douala 1er Projet de déchèterie d’une déchèterie municipale dans la ville de Douala 1er. Conception et réalisation : Archi-TechLe projet est situé en face du marché Sandaga, au rond-point du 4e. Ce projet...
